Installing Loft Floor, Partitions, Wiring - September 19 - 25, 2003September 19, 2003 - Loft floor and wiring September 22, 2003 - Finished loft floor, started partitions, set 6x6 posts September 25, 2003 - Finished first and second floor partitions Painting Metal Brackets - September 27 - 28, 2003September 27, 2003 - Sanding and priming metal brackets (January 25, 2004 note: The black bedliner paint below tended to peel off of the primer. We ran short on metal brackets and had to order more from Jim Barna. We did not use primer on the second batch. The bedliner paint adhered to the metal and resulted in a much nicer finish which did not peel off when the brackets were installed.) September 28, 2003 - Painted with PlastiKoat bedliner for "iron skillet" look Roughing In Plumbing - October 6 - 8, 2003October 6, 2003 October 7, 2003 The first photo below shows a coil of flexible copper in the subfloor. As the second floor settles and pushes the water lines downward, the coil will absorb the settling to prevent damage to the lines. The water lines and conduit fit nicely through the floor trusses. October 8, 2003 More Wiring - October 14 - 17, 2003October 14, 2003 October 15, 2003 October 17, 2003 More Plumbing - October 20, 2003Installing Windows and Doors - October 27, 2003Preparing and Pouring Basement Floor - October 30 - 31, 2003Preparing Ground - October 30, 2003 Finished Floor - October 31, 2003 Installing Basement Partitions and Stairs - November 5 - 6, 2003Installing Network and Phone Cable - November 8, 2003Installing Insulation in Second Floor Shed Dormer - November 9, 2003More Plumbing - November 15, 2003Installing HVAC - October 28 - December 10, 2003All HVAC materials were delivered on October 28, 2003. We met with the installers on October 30 to discuss register and cold air return locations. Register holes were cut out on November 5. The furnace was set, the main trunk line was started, and the metal "openings" were installed below all register holes on November 14. Running Ducts in Basement - November 17, 2003 Finishing Window Installation - November 26 and 28, 2003The custom glass above the kitchen window and the triangles in the foyer took awhile to be made, but they were finally received and were installed around Thanksgiving. Insulating Around Windows - December 7, 2003 |
|
|